Follow us :

  • Sheet acetate prototypes typically take 7–10 days, with color samples ready in 30–45 days. The timeline depends on product complexity.

  • Yes. READSUN frames comply with CE and other international safety standards. Test reports for nickel release, durability, and safety can be provided.

  • READSUN digitally archives mold parameters, material batches, and process standards, using CNC and automated equipment. Each production step references first-order samples and QC benchmarks to maintain identical specifications for repeat orders.

  • Orders are fully tracked through READSUN’s digital milestone management system. Production is scheduled by key process, with materials and components tracked, and exceptions handled promptly to ensure on-time delivery.

  • Yes. READSUN supports third-party pre-shipment inspections to ensure products meet required standards.

  • READSUN verifies issues within 48 hours and provides replacement or compensation solutions. Pre-production trials prevent major structural or quality issues. Defective items during production are reworked; severe issues that cannot be reworked are remade or repaired.

  • READSUN implements dedicated QC checkpoints on each material production line. Production follows standard operating procedures, with first-article inspection on key processes and in-line sampling or full inspection. Defective products are reworked before proceeding. Final products undergo required testing to ensure full quality control. ...