How long does acetate prototyping take?

How long does acetate prototyping take?

Standard acetate prototypes can be completed within 7–10 days.

What happens in those 7–10 days

Cutting a frame shape from an acetate block
Prototype cutting from the selected sheet
  1. Drawing and CAD confirmation: frame dimensions, lens shape, bridge width and temple length are locked before cutting starts.
  2. CNC milling: the frame front and temples are milled from the selected acetate sheet or laminated block.
  3. Assembly and hardware: hinges, nose pads and temple tips are fitted so the prototype can be tried on and measured.
  4. Finishing: tumbling and polishing bring the sample to the surface quality you will see in production.

When it takes longer

Technician milling an acetate frame prototype on a CNC machine
Milling a prototype frame front

The 7–10 day window applies to standard acetate prototypes after the drawing is approved. A new laminated color combination, an engraved metal core, or a completely new hinge design needs extra tooling or material preparation time, and we confirm the revised schedule before starting.

Row of acetate prototype frames at different finishing stages
Acetate prototypes at different finishing stages
Prototypes are the reference for mass production. Any change to shape or color after approval restarts the sample, so it is worth locking the spec early.

Share your design file and target launch date, and READSUN will confirm the sample schedule. Request a prototype quote.